New Home Build Timeline: What You Need to Know

You’ve gone through the process of visiting display homes, choosing the right design, and signed the contract – it’s finally time for your new home build. A new home build will require 6 – 12 months (subject to a range of factors) to complete, with a set sequence of stages that take place. Understanding the timeline will help you keep track of the progress and know what’s required of you throughout the construction.
new home build timeline

1. New Home Build Site Preparation

Demolition – If you are going for a knock-down rebuild, you will obviously need to remove all existing structures on your site – foundation, footings, paving, etc. Not all volume home builders will arrange the demolition for you, but they will be able to recommend reputable companies who can. Through your demolition contractor, you will need to organise a demolition permit from the local council.

Paperwork – Before you start building, you will need to do a feature survey and soil test for your block of land. These services are usually covered as part of your building contract. The feature survey is a scale drawing of your home site showing the fall of the land, service connection points, easements, and any pre-existing features. Soil testing determines the ‘reactivity’ of your soil.

For a knock-down rebuild, you are required to do the soil test and feature survey before the demolition, and then again after. Upon completion, you will also need an independent, licenced asbestos assessor to verify that the site is free of asbestos, which you will be issued with an Asbestos Clearance Certificate.

Sitework – Prepare your land for site start based on your new home builder’s requirements, e.g. get the demolishers to remove all debris and rubble, cut down the grass and weeds. Then it all begins and your land will be excavated in preparation for the concrete slab to be poured. Your builder should send you a written notification that your new home build has commenced.

✓ Building Inspection #1 – Footings. Mandatory inspections are carried out at various stages of the construction period to prevent major issues that may arise in the future. At each stage, the building surveyor must legally sign off the work that has been done by the builder before the next stage can continue. At this point, the building surveyor will inspect the excavation work, boundary clearances, and reinforcements before placing your house’s footings.

2. Foundation/Base Stage

Initial works for underground power and plumbing are put in during this stage.

✓ Building Inspection #2 – Slab/Base. Inspection is conducted before the concrete base is poured and allowed to dry. Aspects of this stage include floor level check, termite treatment, etc.

The slab is then poured and will then need time to ‘cure’.

? First Progress Payment Due. Progress payments will be due upon completion of each building stage. Your first payment usually takes place when the base stage is completed. The percentage to be paid in each stage varies depending on the specific contract with your builder, check the payment schedule outlined in your building contract.

new home builder

3. Frame Stage

The house starts taking shape as carpenters erect wall frames and roof trusses.

✓ Building Inspection #3 – Frame. Checking that the dimensions and placements of the frame conform to the approved plans, and ensure tie down straps to the slab are correctly installed.

? Second Progress Payment Due.

4. Lock-up Stage

Getting the home to a point where it can be ‘locked-up’ with a roof and walls. Fascia, guttering and the roof covering are done, followed by brickwork and external cladding. Windows and external doors will also be installed. Once the cladding has gone on (or while it is going on), plumbers and electricians will ‘rough in’ necessary piping, cabling and fittings. This means to bring in the various lines (plumbing pipes, ducting, electrical conduit) to the house, without making the final connections.

✓ Building Inspection #4 – Waterproofing. Currently only mandatory in QLD and NSW, this includes inspection of roofing, waterproofing, plumbing and windows.

? Third Progress Payment Due.

5. Fixing Stage

Moving on to the interior of the homes, with all the features being fitted. Plasterboard is installed to walls and ceilings; internal doors, cabinets and shelves all go in, as well as skirting boards and architraves. Baths, basins and sinks also appear during this phase; and if it’s a double storey, stairs are added at this point as well.

? Fourth Progress Payment Due.

6. Completion Stage

The last phase of readying the home for you to move into it. Painting and tiling is finished, likewise any external render and the garage doors are installed. Electrical and plumbing fit-offs, benchtops, shower screens and mirrors are all installed. Once this is all done, your builder will arrange for you to be walked through your new home and confirm a handover date with you.

✓ Building Inspection #5 – Final. A throughout inspection checking off on all areas of your completed house according to the building code. The building surveyor will issue a Certificate of Occupancy.

It is not up to the surveyors to judge the quality of your builder’s workmanship, so you should do a double check that everything is working and looking the way they should. Any defects must be highlighted to the builder to be fixed. If you are not feeling confident, you may consider engaging an independent building consultant.

? Final Progress Payment Due. Once you receive the Certificate of Occupancy and the final invoice from the builder, forward those to your bank or lender. In most cases the bank will send a valuer out to the property to inspect the completion of the works before releasing the funds.

7. Settlement

The day you’ve been waiting for when you complete payments and get the keys! Volume builders offer a maintenance period (of varying lengths), which cover any defects in the period after settlement. Discuss with your builder how this process works.

As always, confirm the exact stages, time frames and processes with your builder, as there may be some slight variations. By educating yourself early and understanding the new home build process upfront, you can make the experience a more enjoyable one.

shutterstock_207255709

Related Articles:

Infographic: Getting the most from your builder

4 Construction Trends You Need To Know

The questions you wished you’d asked your builder

iBuildnew Advisory Team
Let us do the legwork for you.
  • We’ll ask the right questions to better understand your needs
  • We’ll create a recommended shortlist ideally matched to you
  • We’ll answer specific questions or concerns related to home building, land purchasing or financing

Zoe Langenberg

Zoe is passionate about coffee and interior design. You can find her most weekends exploring an art gallery or devouring a good book.

About

iBuildNew is the market leading aggregator dedicated to residential home construction and land development. As an independent platform, iBuildNew helps Australians identify and compare new home designs, house and land packages and land estates. It’s the smart way home buyers, who are considering a new build, can find the ideal options to match their individual needs. Home building is a big decision, we make sure you get it right.

You may also like

Sep 08, 2017

Understanding Building Contracts in Your State

If you are planning on building a new home then you will have to sign a building contra...
Read More
Nov 30, 2020

Morrison Government Extends HomeBuilder Grant For A ...

This article was originally published on iBuyNew.com.au and has been reproduced here wi...
Read More
May 04, 2021

Why Is A Pre-Purchase Building Inspection Vital?

The excitement of acquiring property can overshadow the importance of ensuring a buildi...
Read More
Feb 27, 2019

Builder Profile: Fairhaven Homes

Fairhaven has proudly been building quality homes for over a decade, celebrating their ...
Read More
Apr 08, 2016

6 Leading WA Builders to Consider

When it comes to building a new home, finding the right builder is almost just as impor...
Read More
May 14, 2018

Understanding The Process Of Working With A Custom B...

Building a home with a custom builder is different than working with a volume builder. ...
Read More
Mar 05, 2018

The Synergy Between Home Builders & Interior De...

Architecture and interior design is all about teamwork – on the one hand, you have the ...
Read More
Feb 11, 2020

Five Helpful Tips For Working With A Builder

There are few things more vital to a successful and low-stress home build than a strong...
Read More
Mar 04, 2021

Property BOOM: Australian Housing Values Rising At F...

New data from property research firm CoreLogic shows Australian home values have risen ...
Read More
Oct 09, 2019

The 3 Key Elements For A Successful New Build Warranty

With every investment, it is important to have a solid warranty set up that has the pro...
Read More
Aug 15, 2019

Builder Profile: Porter Davis Homes

This piece was written in association with Porter Davis Homes. Porter Davis has been pr...
Read More
Sep 25, 2018

Are you ready for a custom home building project?

Are you thinking of embarking on a custom home building project? Throughout the process...
Read More
Jun 08, 2018

Pros and Cons of Building with Volume Home Builders

Different home builders can work for different people. One of the options is to work wi...
Read More
Jan 15, 2017

Building a Home on your Own | Challenges and Pitfall...

Building a home can be one of the most exciting, nerve-wracking, and unique experiences...
Read More
Sep 10, 2020

Your Land Is About To Be Registered. What Happens Next?

This piece was written in association with Eden Brae Homes. Your deposit has been paid ...
Read More
Mar 06, 2017

Top 5 Questions to Ask Builders Before Construction ...

Building a new home can be quite overwhelming. Even if you know ahead which kind of kit...
Read More
Nov 19, 2019

Builder Profile: Simonds

This piece was written in association with Simonds. Building family homes since 1949, S...
Read More
Mar 20, 2017

Finding the Right Home Builders in Perth

If you are looking at building your new home in Perth, there has never been a better ti...
Read More
Aug 09, 2019

Plantation Homes’ – House For Life Chari...

There is nothing more heartbreaking than hearing about children suffering in hospitals....
Read More
Dec 15, 2023

How To Become A Successful Home Builder?

Becoming a successful home builder can be a rewarding and financially promising career ...
Read More
Oct 15, 2019

How Much Site Access Will I Have During My New Build?

Building a home is one of life’s greatest achievements. Nothing compares to getting on-...
Read More
Dec 15, 2023

Which Home Builder Is The Best?

Building a home is a significant milestone and one of the most crucial decisions in thi...
Read More
Dec 14, 2023

How To Find A Home Builder

Building a new home is a journey filled with excitement and anticipation. One of the mo...
Read More

Get more from

Browse House and Land Packages